Customer required a large amount of GPU compute capacity, with both compute performance and large GPU memory being important. Lead time was a key factor, but with equipment scarce availability on the market - procurement of required technology was difficult. With the current constraints of the market, finding the required equipment in short time was a difficult task. Availability of such equipment is currently limited, especially when the requirements for computing and memory are high.

Nordic Computer Meeting 1

WHAT CUSTOMER NEEDED

Procure a substantial amount of GPU compute capacity, with both compute performance and large GPU memory. The key aspects were:

  • High GPU compute & memory capacity

  • Short lead time

  • Enterprise/data centre hardware

  • A platform that could be thoroughly tested before deployment

THE SOLUTION

Nordic Computer was able to provide 16 refurbished enterprise Nvidia GPUs & 2 refurbished GPU servers. In the end, our help resulted in:

  • Securing a significant amount of A100 80GB capacity quickly

  • Reducing the initial capital requirement substantially

  • Reducing the cost of the project 

  • A platform that could be thoroughly tested before deployment

  • Much shorter delivery time in comparison to alternatives
Picture Server
Untitled Design

SUSTAINABILITY

The project saved 18.083.36kg of CO2 by using refurbished equipment instead of new. That's an equivalent to the carbon captured by around 300 tree seedlings grown for 10 years.

Choosing a sustainable option grants additional benefits such as:

  • Lowers footprint without disrupting operations

  • Helps to meet sustainability requirements under the EU CSRD 